PLANT MOVEMENT
Our complete turnkey philosophy means we cover a wide range of Air Handling Units, Air Conditioning Units and Controls we supply, deliver and install to match our clients' requirements.
Our plant movement options include:
-
Fully assembled (one piece base frame fully assembled and sealed) crane lifted into final location
-
Modular sections (assembled complete sections ready for bolt and seal)
-
Component form (flat pack)
Our Plant Movement complete service covers:
-
Removal of redundant plant
-
Delivery of new plant
-
Safe offloading
-
Distribution to the plant area (contract lifting solutions)
-
Rebuilding in position
Our key to successful delivery and execution is in our detailed and careful planning. At design and pre-manufacture stage, we will already consider plant movement options. .
Our engineers and lifting suppliers are fully trained and qualified to handle the most complex plant move operations and are fully equipped with all the certificates and tools necessary to complete the task. All aspects of our work is fully insured. We stay safety compliant and ensure our employees work safely, completing all our plant movements to the very highest safety standards.
NATIONWIDE HEATING & COOLING - celebrating 10 years of providing complete turnkey mechanical services.
What to expect from our plant movement services:
Book a design meeting to finalise plant options
Site Survey with plant movement specialist team
Discuss the findings with the customer
Proposal
Estimate
Approval
Book a date for plant movement operations
Our Expertise in:
Air Handling Units
Chillers
Refrigeration
VRV systems
Boiler plantrooms
Air Conditioning split systems
Controls
CASE STUDY
PROJECT NAME & LOCATION: NEW INDUSTRIAL CHILLER INSTALLATION, HEXHAM
CLIENT: EGGER
PROJECT VALUE: £60,000
SERVICE(S): NEW CHILLER INSTALLATION, PLANT MOVEMENT
DESCRIPTION OF WORK UNDERTAKEN:
-
EGGER is a leading global manufacturer of wood-based materials.
-
One of its two chipboard manufacturing sites is located at Hexham which supplies products to businesses across the UK.
-
800 strong workforce at Hexham, the largest manufacturing employer in Northumberland.
-
New chiller installation required carrying out an initial feasibility study and design.
-
New CLINT chiller was procured, with installation including mobile crane contract lifting fully planned before delivery.
-
Installation was business critical as downtime would seriously impact manufacturing at the site.
-
Over the same weekend, existing chiller was decommissioned, refrigeration and oil safely removed for sustainable disposal. New chiller crane was then lifted into position, connected and commissioned.
-
Manufacturing plant resumed production on Monday morning with new chiller plant operating without any issues.